Fire Door Inspection - David Collett Blocks A-F (533-538) - 17 February - 31 March 2025

Posted: 17 February 2025

Description of the Works

The work needs to be done to ensure fire safety compliance within University Buildings.

David Collett Block A (533)

David Collett Block B (534)

David Collett Block C (535)

David Collett Block D (536)

David Collett Block E (537)

David Collett Block F (538)

The E&FM joiner will be working in various locations around the building, with the majority of the work in corridors and staircases.  The disruption is expected to be minimal.  The contractor has been asked to report to receptions prior to carrying out the inspections in each building.

Timescale 

From 17 February 2025 - 31 March 2025 - Fire doors maintenance/repair will take place in the buildings above between 9.00 a.m. - 5.00 p.m.

How can I get more information and help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.

Rod Harrison - Fire Compliance Contract Supervisor

Mobile:  07729080155

Email:  R.M.Harrison@lboro.ac.uk