Description of the works
Installation of one fire door set in the corridor area adjacent to room UU2.24, relating to a DDA refuge space. An area in Brockington has been identified as requiring a refuge point to provide a safe area in the event of a fire emergency.
The operatives will wear hi-vis clothing and carry Contractor I.D. badges, please heed their instructions and keep a safe distance from the site of the works. Alternative exit routes are available on the floor level.
Timescale
Duration of works - 2 weeks started 25.3.25 and completed by 4 April 2025 (inclusive).
Please see the Contractors site drawings of the internal layout of the Brockington Extension Building for information on the location of the works.
How can I get more information and help?
The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.
Name and Job Title – Spencer Aryeetey - Building Fabric Surveyor
Mobile: 07977004475
Email: s.aryeetey@lboro.ac.uk