Multiple Buildings - Lift Shaft Fire Alarm Detection Maintenance. Sport Park (081) Michael Pearson East (078) Michael Pearson West (079) ATIC (220)

Posted: 14 April 2025

Description of the works

This is a silent fire alarm testing visit to test the fire detection in the lift shaft with RJ Lifts.

Access will be required to the lift shaft (which will be out of commission for 5 minutes per shaft) and the fire panel.

The testing will be silent, and the fire panel constantly monitored by BTS. No outputs on the system will be activated during the work.

Timescale

22.04.2025

09:30 – 10:15 Sport Park

10:15 – 10:30 MPE

10:30 – 10:45 MPW

10:45 – 11:30 ATIC

How Can I Get More Information and Help?

The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced as a result of these works.

Name: Edward Roe. Fire Alarm Engineer for BTS.

Mobile:  07884 237879

Email Edward@buildingtechnologyservices.co.uk